-
- Jul 04
-
- 0
Ariostat begin testing at the PSA
After the complete installation at the Plataforma Solar de Almería, a few days ago, the Ariostato has begun its trial period.
These tests are grouped into different fundamental aspects of Ariostato´s behavior, including:
- Characterization Ariostat control
- Determining optical quality.
- Electricity Consumption
- System behaviour with wind